top of page

Adolfo Servellon
Architecture Portfolio

Farmingdale State College- SUNY

Project 1:Form and Function

Architectural Design II- ARC 257

This design project demonstrates the necessity of integrating form and function within a bridge design. A bridge was to be modified to allow for a opening that is 30 ft by 40 ft. This allowed for the exploration of form and function within a bridge. Additionally, this project also illustrates the necessity of integrating all design aspects with practicality for the end user. Creativity and technical aspects are combined with functionality to achieve a desired result.

Span Prototype

Name: Ikitsuki bridge

Type: Truss

Location: Ikitsuki, Nagasaki, Japan

Screenshot 2026-10-18 142425.png

Name: Sydney harbour bridge

Type: Arch Bridge ​

Location: Sydney Harbour

Screenshot 2026-09-02 123433.png
Screenshot 2026-10-18 142506.png
Screenshot 2026-09-03 162136.png

Name: Metropolis Bridge

Type: Truss

Location: Metropolis, Illinois,

Movement Analogies

For this design project we were asked to find three objects that have two movements or more and use those as possible design references for the opening mechanism of the bridge. I selected locking pilers, an umbrella and an eyelash curler. We then modeled each of these objects in 3D and made mechanism diagrams for each object to relate moving parts, function and hinges. 

Eyelash Curler

Locking Pilers

Umbrella

Preliminary 3x3 Prototype Table

Screenshot 2026-10-19 113649.png

Selected Protoype

Screenshot 2026-10-18 220442.png

3D Bridge Process

ezgif.com-crop (2).gif

Mechanism Movement

ezgif.com-gif-maker (5).gif

South West

Screenshot 2026-10-26 085948.png

Views

North East

Screenshot 2026-10-26 085040.png

North West

Screenshot 2026-10-26 085142.png

South East

bottom of page